A reading through is taken with the new site of the level and the height change is used to locate the new elevation of the level gun, which is why this process is called differential levelling. This can be repeated until eventually the series of measurements is done. The https://andyqwazg.bligblogging.com/30136732/the-5-second-trick-for-land-survey-experts-bd