The main park provides a capacity of two hundred MW when Sandrini II incorporates a potential of one hundred MW. The whole cost of both equally tasks weren't disclosed nonetheless, all through building, above 200 staff were being used. The jobs are anticipated to check out a handful of positions https://californiasolarservices.politics.blog/2024/10/18/4-ways-commercial-solar-contractors-help-their-customers/