1

The Penmann team completes comprehensive HVAC refurbishment for Nutricia’s production facility in Liverpool in line with FSI Phase 1 and 2

News Discuss 
Penmann successfully delivered a tailored HVAC upgrade at Nutricia’s Liverpool facility, providing a fully engineered ventilation and climate control system designed to satisfy stringent hygiene and production requirements. The scope included the complete lifecycle delivery of advanced HVAC systems across non-production, Medium Care (MC) and High Care (HC) areas. Based https://binksites.com/story10489018/the-penmann-team-completes-major-hvac-upgrade-for-the-liverpool-based-nutricia-facility-to-align-with-the-fsi-development-programme

Comments

    No HTML

    HTML is disabled


Who Upvoted this Story