Installation Overview Newsome has efficiently completed the installation and commissioning of a new 400 kW chiller at a leading confectionery manufacturing site in York. This initiative demonstrates a notable step forward in the client’s ESG commitments, enhancing operational resilience and delivering measurable reductions in both energy consumption and carbon emissions. https://bookmarkingbay.com/story20700364/high-efficiency-400-kw-chiller-installation-achieves-50k-annual-cost-reduction-on-energy-and-200-metric-tonnes-co%E2%82%82-cut