Scheduling is part of the decision. An urgent fault and a planned upgrade should not be written as if they take the same slot.
A useful page about what is North Bay Rubber Surfacing names the job, the constraint, and https://northbayrubbernearme643003.tusblogos.com/43986680/bay-flooring-contractor-what-the-details-actually-say-when-comparing-quotes